Case Study

 

Case Study : 1


PROJECT

HORSE SHOE TUNNEL PROJECT

CLIENT

STRABAG AFCONS AG JV

REQUIREMENT

Three stage plant with VSI to obtain best quality & shaped aggregate from river boulder for precession concreting job inside tunnel

CHALLENGE

Available Crushing & Screening time is only 6 months in a year. Rest of the time the plant is covered by snow

ASSISTANCE

Educate client on how to preserve the plant during winter
Regular health check up of the plant
Inventory plan for spares

 

Case Study : 2


PROJECT

SPONGE IRON PLANT, JHARSUGUDA

CLIENT

SEVEN STAR STEELS LTD

REQUIREMENT

To crush 200 mm lumps of Iron Ore and feed into existing circuit which can take up to 70 mm feed

CHALLENGE

Compact plant with single conveyor which will feed the ground hopper without effecting the existing feed zone

ASSISTANCE

Customise design
Synchronization with the existing plant